Difference between revisions of "SmokeysProjects"

From Bloominglabs
Jump to: navigation, search
(Planned Projects)
(Planned Projects)
Line 10: Line 10:
 
**Supplies 10%
 
**Supplies 10%
 
*Make extension cord with switch for brewing pump
 
*Make extension cord with switch for brewing pump
**4 hour job, once supplies are purchased Need extension cord, outlet with switch and outlet box.  Wanted to have 2 switches, but modifiy later when/if I get a second pump
+
**4 hour job, once supplies are purchased
 +
**Need extension cord, outlet with switch and outlet box.  Wanted to have 2 switches, but modifiy later when/if I get a second pump
 
*Add heating mat to fermentor/kegerator
 
*Add heating mat to fermentor/kegerator
 
**Will need help with Electrical work
 
**Will need help with Electrical work

Revision as of 11:57, 28 January 2015

Planned Projects

  • Build buffet table for home
    • Design 95%
    • Building Material Procurement 4%
  • Modify CPU fan for Stir Plate
    • Fan modified, need enclosure, magnet and stir bar
  • Rehab fixie bike
    • Design 10%
    • Supplies 10%
  • Make extension cord with switch for brewing pump
    • 4 hour job, once supplies are purchased
    • Need extension cord, outlet with switch and outlet box. Wanted to have 2 switches, but modifiy later when/if I get a second pump
  • Add heating mat to fermentor/kegerator
    • Will need help with Electrical work
    • modify BrewPi as needed.
  • Microwave Spot Welder

Possible classes

  • AutoCAD
  • Inventor
  • Homebrewing

Completed Projects

  • Frementation Chamber/Kegerator Build
  • Shoe Cubby Bench
  • Laser'd Tote for Brewing Supplies
  • Built workbenches for space
Personal tools