DosmansProjects: Difference between revisions

From Bloominglabs
Jump to navigationJump to search
No edit summary
No edit summary
Line 2: Line 2:


=== Done or mostly working ===
=== Done or mostly working ===
* [[InkShield_Project]]
* [[Lockpicking_contest_system]] - AKA Rumble Challenge lock picking + drinking game
* [[Lockpicking_contest_system]] - AKA Rumble Challenge lock picking + drinking game
* [[Electric_firework_firing_system]]
* [[Electric_firework_firing_system]]
Line 23: Line 24:
* wearable RF sensory devices (for use with the TI Chronos when it arrives)
* wearable RF sensory devices (for use with the TI Chronos when it arrives)
** attiny with RF receiver and cell phone motor attached to an arm-band
** attiny with RF receiver and cell phone motor attached to an arm-band
* True North belt - research phase
* True North belt - research phase (Steve has working prototype built, see his project page)
** http://feelspace.cogsci.uni-osnabrueck.de/en/index.html
** http://feelspace.cogsci.uni-osnabrueck.de/en/index.html



Revision as of 15:04, 2 December 2011

My project listing, probably always out of date.

Done or mostly working

Active ToDo List

Some day list

  • arduino ps/2 keyboard - to facilitate alternative input controls to software that accepts only keyboard inputs / for stand alone operation
  • ferrofluid
  • more work on interferometer detector circuit with Will

Workshops

  • More Arduino+RF workshops
  • Aluminum casting
    • Make concrete forge
    • Make green sand for molds